HomeFeaturesBuyersSuppliersPricingPartnersBlogContact

The modern procurement trust network.

Product

  • Features
  • Pricing
  • For buyers
  • For suppliers
  • Why suppliers win
  • Industries

Solutions

  • AI procurement software
  • RFQ software
  • RFP management
  • E-sourcing platform
  • Bid evaluation software
  • Supplier management
  • Tender management
  • E-procurement software
  • All solutions

Compare

  • Email vs structured RFQ/RFP/RFI
  • ERP module vs platform
  • Enterprise suite vs sourcing network
  • Marketplace vs network
  • Legacy ERP vs VEXORS
  • SAP Ariba alternative

Company

  • Contact
  • Partners

Resources

  • Blog
  • Templates
  • Glossary
  • Maturity assessment
  • Open tenders
  • ROI calculator
  • Knowledge Hub
  • Security

Legal

  • Privacy Policy
  • Terms of Service
  • Cookie Policy
  • Refund Policy
  • Service Level Agreement
  • Data Processing Addendum
  • Copyright Policy
  • Brand and Trademark Policy
  • Referral Program Terms

© 2026 VEXORS FZC. All rights reserved.

Enterprise-grade security · Built for MENA

Getting started

  • What is VEXORS?
  • Create your account and choose your role
  • Complete your company profile
  • Understanding your Trust Score
  • A guided tour of VEXORS

For buyers

  • Create a Request: RFQ, RFP, or RFI
  • Build your Bill of Quantities
  • Add a Questionnaire
  • Invite suppliers, or open it to the network
  • Set up approval steps
  • Review bids and read AI Scoring
  • Compare bids and responses
  • Award a contract
  • Rate suppliers after an award
  • Save and reuse request templates
  • Edit, amend, or cancel a request
  • Run Q&A and announcements during bidding
  • Find and connect with suppliers in Discover
  • Onboard suppliers with Connect forms
  • Track your work with tasks

Construction projects

  • Run a construction project on VEXORS
  • Import your BoQ from a spreadsheet
  • Manage project documents and drawings
  • Split into trade packages
  • Review the commercial position
  • Price, mark up, and bill your client
  • Understand construction pricing on VEXORS

For suppliers

  • Find Opportunities
  • Submit a Bid
  • Use the Bid Quality Coach
  • Track Your Bids
  • When You Win, and When You Do Not
  • Build Your Catalog
  • Raise Your Trust Score and Get Verified
  • Respond to a buyer's onboarding form
  • Send a service offer to a buyer
  • Manage your customers and connections

AI tools

  • How AI works on VEXORS
  • AI RFQ Drafter
  • Questionnaire Assistant
  • Pre-Publish Insights
  • AI Supplier Matching
  • AI Bid Insights
  • AI Spend Summary
  • Partner Intelligence
  • AI Bid Analysis
  • Supplier Summary

Trust & security

  • Trust and safety on VEXORS
  • Get your business Verified
  • Ratings and reviews, both ways
  • What others can and cannot see

Account & billing

  • Plans and what they unlock
  • Manage your subscription
  • Team members and roles
  • AI credits
  • Payment and invoices
  • Currency settings
  • Referrals

Help center

  • Account and sign-in help
  • Common questions
  • Contact support
  • Set up two-factor authentication
  • Manage your active sessions
  • Choose your notification and email preferences
  • Billing and payment help
  • File a complaint or dispute

Developer docs

  • Developer documentation
Construction projects· Guide 3 of 7

Manage project documents and drawings

Load the spec book and drawing sets into the project library once, as files or a whole folder, attach the drawing register, and hand each trade package only the sections, pages, or sheets it needs.

What you'll learn

  • Upload specs and drawings once, including a whole folder, and read the intake review
  • Attach the drawing register and track sheet coverage across packages
  • Attach a document to a package whole, or by sections, pages, or sheets, with AI suggestions
  • Know exactly what a bidder receives and when an attachment counts as an amendment
~10 min
DocsConstruction projectsManage project documents and drawings·Last updated 2026-09-05

A construction tender is not the bill alone. Behind every line sits a specification clause and a drawing, and a subcontractor prices what they can read. On a project with nine trades, that used to mean nine copies of a 600-page spec book and a drawing folder, with everyone hoping the MEP bidder found the mechanical sections.

VEXORS keeps one project document library on the master request. You upload the spec book and drawing sets once, as PDFs or as a whole folder. The platform reads each document and lists its sections or sheets. Each trade package then picks exactly the parts its trade needs, and the AI package drafter reads those same parts when it writes the package. Scale

Why this matters

Sending a whole spec book to every trade is not thoroughness; it is how scope gets missed. A bidder who receives 600 pages reads none of them carefully, and a bidder who receives the twelve sections that concern their trade prices those sections properly. The library makes the narrow hand-off the easy path, records what each package received, and turns any later change into an amendment the bidders are told about.

Where the library lives

The library is the Documents tab on the master request's page. It appears only on masters (a package has no library of its own; it selects from the master's), and on plans below Scale it is shown locked with an explanation. You can also reach the same uploader from the wizard: on the master's Requirements step, the Reference Documents card offers Upload documents or a whole folder and shows how many documents are already in the project library. PDFs attached there become project documents, and trade packages select sections and page ranges from them.

The tab's hint says it in one line: "Upload spec and drawing PDFs once here. Each trade package then picks the sections or pages it needs."

Uploading documents and folders

app.vexors.com/requests/rq-1180
Upload document
Drag a folder or PDFs here
PDF only, up to 50 MB each. A folder's sub-folders are included.
Choose PDFsChoose a folder
Review folder contents
48 documents ready (612 MB) · Skipped (3) · Duplicates (2)
M-SPEC-Rev-C.pdf · Spec · Already in your library, will be reused
Drawing-Register.xlsx · Use it as this project's drawing register? Use · Not now
Upload 48 documents (612 MB)
  1. Choose files or a folder

    Upload document opens a drop zone: Drag a folder or PDFs here, or use Choose PDFs or Choose a folder. Only PDFs are accepted, each up to the stated size limit, and a folder's sub-folders are included. Set the Document type for the batch, Spec or Drawing, and change it on any single file below. Each file needs a Name; it is what the supplier will see, so "Mechanical Specification Rev C" beats the file name.

  2. Read the folder review

    For a folder, Review folder contents tells you what will happen before anything uploads: how many documents are ready and their total size, a Skipped list (files that are not PDFs, or over the limit), and a Duplicates list (Already in this project). A file that already exists in your company library carries Already in your library, will be reused and is not uploaded twice. If the folder holds a drawing register spreadsheet, a banner offers Use it as this project's drawing register with Use or Not now. Folders above the file cap are refused with the limit stated; large folders upload in batches, and the review says how many.

  3. Upload, pause, resume

    Upload N documents starts. You see N of N documents uploaded, bytes progress, the current batch, and a time estimate. Pause lets files already in progress finish and starts nothing new until Resume. Closing during an upload asks first (Uploads in progress): files not yet finished stop, and everything already added stays. If your browser closes mid-way, the tab later shows Resume: (folder) with Pick the same folder to continue; files that do not match the original session are excluded and named. A file that fails is marked failed and can be retried; one bad file never fails the rest of the batch.

  4. Analysis runs behind you

    When the upload finishes, a summary counts uploaded, reused, skipped, and failed, with Download CSV for the record. Every document is added and ready to attach whole at once. Reading a document's sections or sheets is a separate analysis that runs a couple at a time, so the rest queue: the tab shows Analysing N of N documents, and Analyse first on a document, or on a whole folder, moves it to the front.

Reading the library

Each document row shows its kind (Spec or Drawing), its analysis state (N sections detected, N pages, Not analysed yet, Extracting…, or Extraction failed), and the folder it came from. Filter with All or Not analysed, by folder, or with Group by folder; search by name.

Two actions live on each row:

  • Re-analyse document reads the document again and rebuilds its section list. Nothing is deleted and any extract already generated for a package stays as it is, but sections you had picked from this document for a package will need to be picked again; that package shows a notice until you do.
  • Archive removes the document from selection. Existing package selections that reference it are unaffected.

The drawing register and sheet coverage

Drawing sets are only useful if every sheet can be named and tracked. Two panels on the Documents tab handle that:

  • Drawing register: Attach register takes the project's drawing register spreadsheet (xlsx). It names every sheet and its trade, and drives sheet naming and coverage across your trade packages. The card shows N sheets listed. Attached (date)., with Replace and Remove register (removing drops the names and trade grouping; the uploaded file itself is not deleted).
  • Sheet coverage: how many register sheets have actually been uploaded to the project, how many drawing sheets are selected into at least one package, and which drawings still have sheets in no package. When every sheet reaches a package the panel says so; until then it names the shortfall, drawing by drawing.

Attaching documents to a package

app.vexors.com/requests/rq-1180/packages
Attach documents
Pick the sections or page ranges this package needs from the project's document library.
Suggest sectionsSuggested
Mechanical Specification Rev C · 84 sections detected
How to attach this document: Attach the whole document · Choose specific sections · Choose specific pages
☑ 23 05 00 Common Work Results for HVAC · ☑ 23 07 00 HVAC Insulation · ☐ 22 11 00 Facility Water Distribution
Mechanical Drawings Set · 61 sheets · Choose specific sheets · ☑ M-101 · ☑ M-102 · ☐ P-201
Status: Not sent yet
Confirm AI scopeGenerate

From a package card on the Split tab, Attach documents opens the library for that package. For each document you choose How to attach this document:

  • Attach the whole document: the supplier receives your original file exactly as you uploaded it, not a regenerated copy.
  • Choose specific sections: for an analysed spec, tick the sections this trade needs, grouped by division. Search within the sections; Select all and Clear are there for long lists. If the contents list names more sections than were found, the dialog says how many matched.
  • Choose specific pages: add up to a stated number of page ranges (Add page range, From, To).
  • Choose specific sheets: for a drawing set, tick the sheets, named from the register when one is attached.

A page budget applies per selection and per package; the dialog warns when a selection or the package as a whole is over it, so a "narrow" hand-off cannot quietly become the whole book again.

Two AI helpers sit alongside:

  • Suggest sections proposes a selection for this package from its BoQ lines, marks it Suggested, and shows a banner until you review the ticks. Clear suggestions discards them. If your credit balance is too low for the AI refinement, the basic suggestions still appear and the dialog tells you the refinement was skipped.
  • AI drafter scope: pick only the sections the AI description drafter should read, then Confirm AI scope. Until you confirm a narrower scope, the drafter reads the whole attachment. The confirmed count shows as a chip on the package.

Selections are not sent by ticking. Generate builds the extract the supplier will receive; each document shows Not sent yet, Generating…, or Ready, and a notice counts anything configured but never generated. Remove from package takes a document out of the selection; it can be re-added later. To attach several whole documents at once, tick them in the list and use Attach N documents.

On a published package, generating or changing a selection notifies the bidders as an amendment. The dialog says so, and the bulk path asks Attach to a published package? before Attach and notify suppliers. That is correct behaviour: a bidder who priced against yesterday's drawings must know today's arrived.

What suppliers receive

What the supplier sees

On the opportunity, a Reference Documents card lists what the buyer attached to this package: whole files, generated section extracts, page ranges, or drawing sheets, with a download for each. Where a BoQ line carries its own attachment, a chip on the line opens it. Suppliers never see the rest of the library, other packages' selections, or the master. If the buyer changes a selection after publishing, it arrives as an amendment with a notification, and a bid already submitted is flagged for revision like any other amendment.

What good looks like

  • The spec book and the full drawing set are in the library, analysed, before the first package is created.
  • The drawing register is attached, so every sheet has a name and sheet coverage can reach 100%.
  • Each package receives sections and sheets, not the whole book; the whole-document mode is reserved for short documents that genuinely apply to every trade.
  • The AI drafter scope is confirmed for each package before Draft all package descriptions, so the drafts are written from the right clauses.
  • Every selection shows Ready before the package publishes; nothing is left at Not sent yet.

Next steps

  • Split into trade packagesCreate the packages these documents attach to, and draft their descriptions from the attached sections.
  • Run a construction projectWhere the Documents tab sits in the full project journey.
  • Import your BoQ from a spreadsheetThe bill the documents sit behind.
Load your first project library
Was this page helpful?
PreviousImport your BoQ from a spreadsheetNextSplit into trade packages

Related guides

Run a construction project on VEXORSHow a main contractor takes one master Bill of Quantities from import to a priced, marked-up client bill: the project cockpit, its four tabs, trade packages, project documents, and the full buy-out loop.Split into trade packagesCarve the master BoQ into per-trade tenders: create packages, attach the right documents, draft their details with AI, publish and manage deadlines from the cards or in bulk, and watch pricing roll back onto the master.Import your BoQ from a spreadsheetBring a Bill of Quantities workbook into VEXORS: the quick single-sheet importer, the AI full-workbook import from the BoQ step or the AI drafter, and the rules that guarantee nothing is ever guessed.

Get started with VEXORS

Set up your account and explore the platform.

On this page

  • Where the library lives
  • Uploading documents and folders
  • Reading the library
  • The drawing register and sheet coverage
  • Attaching documents to a package
  • What suppliers receive
  • What good looks like