A BoQ template that splits every rate into material and labour
Material rate, labour rate, total rate and amount on every line, so you see what a bidder charges for the work and what for the goods. Built for labour-only packages and for supply-and-fix, in English and Arabic.
No card to start. Your first request goes out in minutes.
- Free to start, no card
- Your data stays yours
- Suppliers respond free
Download the free labour and material BoQ template
Real .xlsx files in English and Arabic, with formulas in place.
What is a labour and material BoQ?
A labour and material BoQ prices each line in two parts instead of one: a material rate for the goods and a labour rate for the work to install them, with a total rate and an amount calculated from both. It suits labour-only subcontracts, where a bidder supplies only the work, and supply-and-fix packages, where the same rate has to cover materials as well. Splitting the rate is what lets a buyer see where a bidder's price actually sits, instead of reading one blended number that could hide either a thin labour charge or an inflated material cost.
What's inside
Four price columns on every line: material rate, labour rate, total rate and amount, with the formulas in place
Twenty items across blockwork, plaster, tiling, painting, rebar, formwork, concrete, electrical and plumbing points, ceilings, joinery and waterproofing
Supply-and-fix and fixing-only lines side by side, so the scope of each rate is written down
Labour-supply lines by the man-day, for skilled and general labour
A summary that totals material and labour separately
Material plus labour equals the total rate, and the total rate multiplied by the quantity equals the amount, on every line, before a bidder types a single number.
See the split, not just the total
A blended rate hides whether a bidder is pricing thin labour and rich materials, or the other way round. Splitting the rate puts both numbers in front of you on every line, before you commit to a total you cannot take apart later.
Compare supply-and-fix and labour-only fairly
Two subcontractors quoting different scopes are not really competing. Carrying supply-and-fix and fixing-only as separate line types means every bidder prices the same defined scope, so the comparison means what it looks like it means.
Price labour the way the site actually buys it
General labour and skilled trades are often bought by the day, not by the item. Man-day lines give that labour a proper rate and a proper total, instead of folding it into a lump sum nobody can check.
A sample of real rows
Five rows out of twenty. These carry the labour-and-material split furthest, including the two blockwork rows priced two different ways.
| Item | Description | Unit | Quantity |
|---|---|---|---|
| D.1 | Supply and fix 200 mm solid concrete blockwork in cement mortar 1:4 | m2 | 620 |
| D.2 | Fixing only, concrete blockwork, material supplied by others | m2 | 620 |
| D.5 | Fixing only, ceramic or porcelain floor tiles, material supplied by others | m2 | 410 |
| D.8 | Rebar fixing labour only: cut, bend and tie in position, steel supplied by others | tonne | 38 |
| D.19 | General labour supply, per man-day, site clean-up and material handling | man-day | 120 |
- D.1m2 · 620
Supply and fix 200 mm solid concrete blockwork in cement mortar 1:4
- D.2m2 · 620
Fixing only, concrete blockwork, material supplied by others
- D.5m2 · 410
Fixing only, ceramic or porcelain floor tiles, material supplied by others
- D.8tonne · 38
Rebar fixing labour only: cut, bend and tie in position, steel supplied by others
- D.19man-day · 120
General labour supply, per man-day, site clean-up and material handling
Rows D.1 and D.2 price the same blockwork two ways: complete, or labour only when you already supply the blocks and the mortar. Compare them and the difference between the two lines is entirely the material rate.
What the material and labour columns actually tell you
Two ways to price the same wall, side by side
Row D.1 in the sample is supply and fix: the bidder buys the blocks, the cement and the mortar, and lays them. Row D.2 is the same 200 mm blockwork fixing only, with the material supplied by others. Carrying both as separate line types, rather than one item and a note in the margin, means a bidder cannot price the wrong scope by mistake, and a buyer can tender either version of the same trade from one file. Which one you send out is a real decision: supply-and-fix is simpler to manage, fixing-only makes sense when you already hold a material supply agreement and want to buy the labour on its own.
- Every line marked supply-and-fix or fixing-only, never left to the description alone
- Material rate left blank on a fixing-only line, so nothing is priced twice
- The same trade tendered either way from one file
- A bidder cannot quietly swap scope and still look like the low bid
Three returned files, the same total, three different bets
Three subcontractors send back the same file, each landing on the identical total rate for a line: 50. Open the three returned workbooks side by side and the number stops being the whole story: one bidder carries most of it in labour, betting on a fast crew; another carries it in material, guarding against a price rise on steel or cement; a third splits it down the middle. The blended total shows none of this on its own. Read the material and labour columns of each file together, and the same figure starts to say who is exposed to a material swing, who is betting on productivity, and which line is worth a question before you sign.
- Material rate and labour rate compared file by file, not just the total column
- A thin material rate on a supply-and-fix line is worth a question before award
- A high labour rate can mean a faster crew, or an inflated one
- Rate patterns repeated across a bidder's own file point to how they price, not just one line
Skilled and general labour, priced the way the site pays it
Not every line has a quantity you can measure in square metres or tonnes. Site clean-up, material handling and standby labour are bought by time, so the template carries them as man-day lines: one rate for one worker for one working day, split by skill level between general labour and a named trade. Pricing this properly stops a subcontractor folding an open-ended labour allowance into the rate of an unrelated item, where it cannot be checked or challenged later. It also lets you compare man-day rates across bidders directly, the same way you compare a rate for concrete or blockwork.
- General and skilled labour priced separately, by the man-day
- Site clean-up and material handling carried on their own line, not folded into another rate
- A man-day rate compares directly across every bidder
- Keeps open-ended labour allowances out of rates that should be fixed
One rate a line, every bidder, ranked automatically
Import the file once and every row becomes a line each subcontractor prices with a single rate, in a browser or on a phone: the supply-and-fix and fixing-only lines stay separate lines, so the scope behind each rate is still written down and every bidder is compared like for like. A bidder can add a note to a line, the material and labour behind the number, but the rate itself stays one figure. Any line left unpriced is counted and priced back in at your estimate or the median of the other bids, and every rate with three or more prices is checked against the median and flagged with its ratio where it is far out of line.
- Every imported row becomes one line every bidder prices; supply-and-fix and fixing-only stay apart
- A bidder can note the material and labour behind a rate; the rate itself stays one figure
- Unpriced lines are counted and priced back in before totals are ranked
- A rate far from the median is flagged with its ratio, for you to question before award
- AI evaluates every bid against your criteria and recommends; the award and its approvals stay yours
What happens after you press send
The rate on each line
- Emailed as a spreadsheet
- Bidders type over the same cells in five different copies; formatting and formulas drift from file to file
- Sent as a tender on VEXORS
- Every bidder prices the same protected line once; the formula behind it cannot be broken
Supply-and-fix vs fixing-only
- Emailed as a spreadsheet
- Easy to price the wrong scope if a bidder skims the description
- Sent as a tender on VEXORS
- The scope is fixed on the line; a bidder cannot price the wrong one by mistake
Man-day labour lines
- Emailed as a spreadsheet
- Often arrive as one figure in the covering email, not a rate
- Sent as a tender on VEXORS
- Priced on their own line, man-days times the day rate, inside the total automatically
Comparing bidders
- Emailed as a spreadsheet
- You copy five files into one sheet by hand and hope the columns still line up
- Sent as a tender on VEXORS
- Bids land already lined up on your BoQ; the comparison builds itself
Spotting an unusual rate
- Emailed as a spreadsheet
- One number per item, and a guess about which bidder is exposed
- Sent as a tender on VEXORS
- Every rate with three or more prices checked against the median, flagged with its ratio if it is out of line
Version control
- Emailed as a spreadsheet
- Whoever emails last, or loudest, gets read first
- Sent as a tender on VEXORS
- One current version; every bidder prices the same revision
The record
- Emailed as a spreadsheet
- Scattered across email threads and desktop copies
- Sent as a tender on VEXORS
- Kept with the tender: every rate, every revision, every named approval
Who this template is for
Main contractors tendering labour-only trades
Where the material is already on order or supplied centrally, and the package is really just buying a crew's time against a measured scope.
Developers running supply-and-fix packages
Comparing bidders who each buy their own material, and wanting the rates in the file itself to show whether a low total is coming from the goods or the work.
Subcontractors pricing their own labour and supply-and-fix work
A ready structure to quote either scope, and to show exactly what sits behind a total rate before it goes out to a main contractor.
Quantity surveyors levelling bids by rate, not just by total
A rate-by-rate view across five bidders makes an unusual number visible long before it becomes a variation claim.
How to use it
Decide who supplies what.
Mark each line supply-and-fix or fixing-only before it goes out; that decides what the rate covers.
Read both rates.
A low total with a high labour rate and a thin material rate tells you where the bidder expects to make the money.
Send it as a tender.
Import the file into VEXORS and send it to your labour and trade subcontractors.
Let the bids come back levelled.
Every subcontractor prices the same imported lines with a single rate each. Any line left unpriced is counted and priced back in, and a rate far from the median is flagged with its ratio, so the ranked totals are ready the moment the deadline closes.
Labour and material BoQ template FAQ
Read next
- Fit-out and kitchen BoQ templateThe nine-section fit-out BoQ, with the kitchen priced separately from its cabinetry and fittings.
- The BoQ templateThe general-purpose bill of quantities: sections, quantity and rate columns, automatic totals.
- How to level construction bidsThe method step by step, with a worked example of five bids.
- Villa BoQ templateTwelve sections for a G+1 villa, measured the way Gulf villas are built.