A villa BoQ template, measured the way Gulf villas are built
Twelve sections from preliminaries to external works, forty measured items with their specifications written in, and totals that add up as you price. For a G+1 villa with a roof, in English and Arabic.
No card to start. Your first request goes out in minutes.
- Free to start, no card
- Your data stays yours
- Suppliers respond free
Download the free villa BoQ template
Real .xlsx files in English and Arabic, with formulas in place.
What is a villa BoQ template?
A villa BoQ template is a bill of quantities built for a ground-plus-one home: sections in the order a villa is built, from preliminaries to external works, with the specification written into each description so a bidder prices the exact item, not a guess. Units and quantities are fixed by the buyer; rate and amount are left for the bidder to fill, and a summary keeps contingency and VAT apart from the rates. It gives every subcontractor the same scope to price, trade by trade.
What's inside
Twelve sections in build order: preliminaries, earthworks, substructure, superstructure, blockwork, waterproofing and insulation, plaster, finishes, doors and windows, MEP, external works, provisional sums
Forty items with the specification in the description: concrete grades, block sizes, membrane types, finishes
Unit and quantity columns you fix; rate and amount columns the bidder prices; a total per section
MEP carried as provisional sums, pointing to the electrical BoQ template for the full package
A summary sheet with contingency and VAT on their own lines, never inside the rates
- 12
- Sections
- 40
- Items
- G+1
- Villa
- EN / AR
- Languages
Sized for a G+1 villa
Twelve sections and forty items cover a ground-plus-one villa with a roof: enough structure to price the whole build, without the bulk of a commercial BoQ you would spend a day trimming down.
The specification travels with the price
Concrete grade, block size, membrane type and finish sit inside the description column, next to the item they belong to, so a bidder cannot price a cheaper spec and call it the same job.
Every trade compares the same way
Send the same structure to your blockwork, waterproofing, finishes and MEP subcontractors and their prices land on the same lines, ready to compare trade by trade.
A sample of real rows
Five rows from the villa BoQ. Item, description and quantity are already filled; rate and amount stay empty in the file you send out, because that is what each bidder prices.
| Item | Description and specification | Unit | Quantity |
|---|---|---|---|
| B.2 | Excavation in ordinary soil for foundations to the specified depth, including disposal off site | m3 | 210 |
| C.2 | Reinforced concrete grade 30 to isolated and strip footings, to the structural drawings | m3 | 64 |
| D.3 | Reinforced concrete grade 35 to suspended slabs, first floor and roof | m3 | 96 |
| F.3 | Torch-applied bituminous membrane to the roof slab, with protective screed | m2 | 240 |
| H.1 | Ceramic floor tiles fixed with tile adhesive, including skirting | m2 | 410 |
- B.2m3 · 210
Excavation in ordinary soil for foundations to the specified depth, including disposal off site
- C.2m3 · 64
Reinforced concrete grade 30 to isolated and strip footings, to the structural drawings
- D.3m3 · 96
Reinforced concrete grade 35 to suspended slabs, first floor and roof
- F.3m2 · 240
Torch-applied bituminous membrane to the roof slab, with protective screed
- H.1m2 · 410
Ceramic floor tiles fixed with tile adhesive, including skirting
Notice what travels with the item: the concrete grade, the membrane type, whether disposal is included. That is what keeps every bidder pricing the same job, not their own guess of it.
What the twelve sections actually carry
Twelve sections, in the order the villa gets built
The sections run preliminaries, earthworks, substructure, superstructure, blockwork, waterproofing and insulation, plaster, finishes, doors and windows, MEP, external works, then provisional sums, so pricing follows the same sequence a site does. Delete a section the villa does not need and the numbering still holds; add a row under the right section for anything specific to your plot.
- Forty items already measured, with the specification written into each one
- A section for provisional sums, kept apart from the firm quantities
- Numbering that survives adding or deleting a row
- The same order a Gulf villa is actually built in, site to summary
The specification lives in the description, not in a separate note
A description that just says "concrete" leaves the grade to the bidder, and every bidder resolves that gap in their own favour. This template writes the grade, block size, membrane type or finish straight into the description column, on the same row as the quantity, so the item a bidder prices is the item you meant.
- Concrete grades named on every structural item, not assumed
- Block sizes and membrane types written into the item, not a footnote
- Finishes named where they change the price: tiling, painting, joinery
- One description a bidder cannot read two ways
MEP carried as a provisional sum, priced properly next door
The villa BoQ carries MEP as a single provisional sum in its last section, so the file can go out before the electrical and plumbing design is finished. Once that design is ready, price MEP in full with the electrical BoQ template and replace the provisional sum with the real figure, on the same trade-by-trade logic as every other section.
- One provisional sum, not a guessed lump figure dressed as firm
- MEP tendered as its own package once the design is ready
- The electrical BoQ template picks up exactly where this sum leaves off
- No MEP guess buried inside another trade's rate
One summary, with contingency and VAT kept apart from the rates
Every section rolls up into a summary sheet, where contingency and VAT sit on their own lines instead of being folded into a bidder's rate. That keeps the number you carry for risk and the number the government takes separate from what the work itself costs, so the grand total is never a rate in disguise.
- Section subtotals that roll up automatically as bids come in
- Contingency shown as its own percentage, never hidden in a rate
- VAT added once, at the summary, not row by row
- A grand total that shows the real build cost apart from tax and risk
The villa tendered trade by trade, bids that come back comparable
Split the BoQ into packages: blockwork, waterproofing, finishes, MEP, external works, and send each to the subcontractors who actually do that work. Every bid returns in the same structure, so a package with a low total as submitted and several unpriced items still gets caught before you compare on the wrong number.
- Each trade sent to the subcontractors who price it, not one contractor pricing everything
- Bids that return on your own BoQ lines, package by package
- Unpriced items counted and priced back in before you compare totals
- The lowest total as submitted checked before it is trusted
What happens once the file leaves your inbox
Sending it out
- Sent by email
- One email per subcontractor, hoping the attachment opens the same way for everyone
- Sent as a tender on VEXORS
- One link, the same file and the same deadline, to every subcontractor on your list
An item nobody priced
- Sent by email
- Sits blank until someone notices in the comparison meeting
- Sent as a tender on VEXORS
- Counted automatically and priced back in at your estimate or the other bids' median
A rate that looks wrong
- Sent by email
- Only caught if someone happens to scroll past it
- Sent as a tender on VEXORS
- Flagged against the median of the other bids, with the ratio shown
A question from a bidder
- Sent by email
- Answered by phone or reply-all, so the other bidders never see it
- Sent as a tender on VEXORS
- Answered once and published to every bidder, without naming who asked
A revised drawing
- Sent by email
- Re-sent by email, with no record of who priced the old version
- Sent as a tender on VEXORS
- Reaches every bidder at once, and a bid on the old revision is flagged
Comparing the bids
- Sent by email
- A second spreadsheet, rebuilt by hand, one bidder at a time
- Sent as a tender on VEXORS
- Built automatically as bids arrive, on your own BoQ lines
The MEP provisional sum
- Sent by email
- A figure nobody revisits until the trade is tendered on its own
- Sent as a tender on VEXORS
- Carried straight into the electrical BoQ template, on the same lines
The award
- Sent by email
- A decision made in someone's head, confirmed by email
- Sent as a tender on VEXORS
- Recorded with the scores, the reasons and the approvals behind it
Who tenders a villa this way
Developers
Building a villa or a small development and tendering it trade by trade instead of handing the whole build to one main contractor.
Main contractors
Pricing the villa as a single job, then splitting the work into packages for their blockwork, waterproofing, finishes and MEP subcontractors.
Owners building direct
Running a villa build without a main contractor, and tendering each trade to subcontractors themselves.
Consultants and quantity surveyors
Preparing the BoQ on the client's behalf and issuing it to a bidder list the consultant manages.
How to use it
Measure from the drawings
Fill the quantities section by section; delete the rows the villa does not need and add your own under the right section.
Keep the specification in the description
A bidder who prices "concrete" and one who prices "grade 35 concrete" are pricing different jobs.
Send it as a tender
Import the file into VEXORS: every row becomes a line bidders price, and every bid comes back comparable.
Compare bids as they land
Rates are checked against each other as bids arrive, terms are costed, and every bid is scored against your criteria before you award.
Importing a BoQ into VEXORS and splitting it into trade packages are part of the Scale plan. The template itself is free, and RFQs, RFPs and RFIs with line items run on every plan, including the free Explore plan.
Your first tender can go out the day you sign up.
Villa BoQ template FAQ
Read next
- Electrical BoQ templateThe provisional sum in this template, priced properly: panels, cables, wiring devices, lighting, earthing and ELV.
- The BoQ templateThe same workbook engine for a general building works or materials package, not built around a villa.
- How to level construction bidsWhat happens to unpriced items and low totals once bids are compared on the same lines.
- Construction procurement on VEXORSHow contractors and developers run the whole tender, from the BoQ to the award, on one platform.